Core Underwater Moho Mine

Built By:




Basic Stats
Designation CORUMOHO
Metal Cost 1512
Energy Cost 13288
Build Time 30240
Footprint 5x5
LoS 150
Max Damage 1675
Damage Modifier 0.33333
Modified Damage 5025
Detection Stats
Builds:

Movement Stats
Weapon Stats
Miscellaneous Stats
Min Water Depth 19
Max Slope 24
Explosion SMALL_BUILDINGEX
Self-D Explosion SMALL_BUILDING
Energy Use 40
Metal Extraction 0.006
Construction Stats



Some images / content (C) Cavedog Entertainment (TM).
Content (C) 2001 Mayhem Inc. This page may be recreated or used in another site's frame provided that there is a link to the originating site (this site), and provided it is not used commercially.